From Construction to Opening: The 52-Item Life-Saving Checklist of Rough and Finish Works

From Construction to Opening: The 52-Item Life-Saving Checklist of Rough and Finish Works
Contents · 7 sections
  1. PHASE 1: PRELIMINARY PREPARATION (Before construction — 2-4 weeks)
  2. PHASE 2: ROUGH WORK (3-6 weeks)
  3. PHASE 3: FINE WORKS (3-5 weeks)
  4. PHASE 4: EQUIPMENT AND TECHNOLOGY (1-2 weeks)
  5. PHASE 5: OPENING PREPARATION (1-2 weeks)
  6. Budget planning — approximate framework
  7. The most common construction mistakes

You signed the lease. The keys are in your hand. Now what? The foreman arrived and said, "let's begin." But what, in what order, and in how much time? If you start without knowing this — the work will drag on twice as long, and the budget will be considerably more than you anticipated.

The construction process is the most expensive, most stressful, and most problem-prone stage of opening a restaurant. But with systematic planning, you can save time, money, and nerves.

In this article, I divide construction into 5 phases. I provide a checklist for each phase. Print it, give it to the foreman, check it every day.


PHASE 1: PRELIMINARY PREPARATION (Before construction — 2-4 weeks)

At this stage, don't pick up a brick. First, complete the documents, permits, and technical inspections.

#ItemNote☐
13-phase electrical inspectionASAN Kommunal → Azərişıq technical inspection☐
2Natural gas connection inspectionIs there a gas line? If a new one must be laid — add to budget☐
3Water and sewage entry pointsWhere? Does it match the kitchen plan?☐
4Chimney exit pointWhere will it be? Risk of neighbor conflict?☐
5Ceiling height measurementMinimum 3 meters — for suspended ceiling + ventilation☐
6Property code inspectionPrevious tenant's tax/DSMF debt?☐
7Preparation of construction project (plan)Kitchen, hall, storage, toilet — location of everything☐
8Preparation of construction budgetRough + finishing work + reserve fund (15%)☐
9Selection of foreman/contractorCompare from a minimum of 3 offers☐
10Construction contractTime, price, material, penalty terms in writing☐
11AQTA registrationASAN Service/KOBİA — IT IS FREE☐
12FHN permit applicationFire safety plan☐

⚠️ Warning: 3-phase electricity, natural gas, and chimney — DO NOT START CONSTRUCTION without checking these three. These three alone can kill the project. We explained this in detail in our "12 Mistakes" article.


PHASE 2: ROUGH WORK (3-6 weeks)

Rough work is the "skeleton" of the building. Walls, floor, ceiling, water/electrical/gas lines.

#ItemNote☐
13Demolition workOld walls, floor, suspended ceiling☐
14Construction of new wallsKitchen-hall separation, toilet, storage☐
15Plumbing installation (laying)Kitchen sinks, toilet, dishwasher location☐
16Sewage layingGrease trap is mandatory☐
17Laying electrical lines3-phase + separate lines: kitchen, hall, lighting☐
18Laying the gas lineNatural gas — do not use propane!☐
19Ventilation ductsKitchen — separate, hall — separate system☐
20Chimney installationChimney filters, fire extinguishing system☐
21Floor preparationNon-slip, washable in the kitchen☐
22Ceiling preparationStructure for suspended ceiling☐
23Fire extinguishing systemSprinkler or extinguisher — FHN requirement☐
24InsulationSound insulation (for neighbor complaints) + thermal☐

PHASE 3: FINE WORKS (3-5 weeks)

Fine works — this is the part the customer will see. Wall paint, flooring, lighting, furniture.

#ItemNote☐
25Wall paint / coveringColors matching the concept☐
26FlooringHall: parquet/ceramics, Kitchen: non-slip ceramics☐
27Suspended ceiling installationLight points must be planned in advance☐
28Lighting systemDimmer is a must — day/evening difference☐
29Air conditioning systemKitchen + hall + storage — separate zones☐
30Toilet renovationCustomer toilet + staff toilet must be separate☐
31Bar/cashier areaPOS location, cash storage, electrical outlets☐
32Storefront / entrance designFirst impression — detailed in our "Atmosphere" article☐
33Signage installationDon't forget the advertising (signage) permit!☐
34Furniture installationTables, chairs — matching the concept☐
35Decor elementsPaintings, plants, accessories☐
36Music systemSound system + business music subscription☐

Tool for this articleFrom construction to openingStage-by-stage plan and site notesOpen tool

PHASE 4: EQUIPMENT AND TECHNOLOGY (1-2 weeks)

#ItemNote☐
37Industrial oven/stove installationThree-phase connection, gas connection☐
38Refrigerator installationTemperature check, 24-hour test☐
39Freezer installation-18°C test☐
40DishwasherWater connection + drainage☐
41Prep tables (stainless steel)Stainless steel — hygiene requirement☐
42POS system installationCash register + tablets + printer☐
43Internet / Wi-FiStable internet is a must for POS☐
44Camera systemKitchen, cashier, entrance — minimum 4 cameras☐
45Alarm systemSecurity after closing☐

⚠️ Warning: Leasing equipment may be more budget-friendly. Instead of buying 50,000₼ worth of equipment outright, you can make monthly payments through leasing — less strain on the starting budget.


PHASE 5: OPENING PREPARATION (1-2 weeks)

Construction is done. Now prepare for opening.

#ItemNote☐
46AQTA final inspectionAre hygiene requirements fully met?☐
47FHN final inspectionFire equipment, exits☐
48Hiring employeesRecruitment + medical certificates☐
49Training period (min 1-2 weeks)Menu, service, POS, hygiene☐
50Soft openingFriends, family — 3-5 days of testing☐
51Menu final checkPrices, food cost, design☐
52Grand openingMarketing, social media, guests☐


Budget planning — approximate framework

Approximate construction budget for a small-to-medium restaurant (50-80 m², 30-40 seats):

PhaseApproximate cost (₼)Percentage
Preliminary preparation (documents, design)2,000-5,0003-5%
Rough works20,000-40,00030-35%
Finishing works15,000-30,00020-25%
Equipment25,000-50,00030-35%
Opening preparation (training, soft opening)3,000-5,0003-5%
Reserve fund (15%)10,000-20,00015%
TOTAL75,000-150,000₼100%

⚠️ Warning: These figures are highly variable — the condition of the building, location, concept, and choice of materials change everything. But the reserve fund is mandatory — minimum 15%. As we said in our "Hidden Costs" article: unexpected costs ALWAYS happen.


The most common construction mistakes

MistakeConsequenceSolution
Starting without checking the 3 phasesMajor additional cost, delayCheck BEFORE construction
Hiring a "cheap contractor"Unfinished work, redoing itCompare 3 quotes, don't pick the cheapest
Not signing a written contractTime drags on, price increases, you can't make a claimAgree on everything in writing
Drawing the kitchen plan without a chefEquipment doesn't fit, workflow is disruptedInvolve the head chef in the planning
Not setting aside a reserve fundAn unexpected cost collapses the budgetMinimum 15% reserve
Putting up a sign without a permitFineGet the permit first
Installing a chimney without talking to the neighborsComplaint, municipality problemInform them in advance

DK Agency notu

📝 DOĞAN'S NOTE: "An entrepreneur came and said 'the renovation will be done in 2 months.' It was done in 5 months. Why? Because there was no plan. The foreman brings paint today, lays a water pipe tomorrow, and goes back to painting the day after. The phases got mixed up, every task was done twice. If he had given this checklist to the foreman — it would have been done in 2.5 months. Phased work = time savings = money savings."

Doğan Tomris— Doğan Tomris

💡 DK Agency: Do you want construction supervision and project management? The interactive version of this list — with the ability to add notes and photos to each item — is in DK Agency's free "From Construction to Opening: Checklist" tool. If you'd like to plan your project together, write to us.

📧 info@dkagency.com.tr | 🔧 From Construction to Opening Checklist | 🌐 Marketing Ocağı

To want to own a restaurant can be a strange and terrible affliction.
ANTHONY BOURDAINSource: Kitchen Confidential
Next stepFrom construction to openingStage-by-stage plan and site notes
DK Agency

How DK Agency helps

If what this post describes is happening in your restaurant, café or hotel, write to us: we will look at it together and show you the first step. The first diagnostic is free.

KAZAN AI · Beta

Ask KAZAN AI about this topic

Your dish, your numbers. KAZAN AI answers from the DK knowledge base and points you to the right tool.

Open KAZAN AI
Answers are advice; the decision is yours.
Keep reading

Related posts

Blog