From Construction to Opening: The 52-Item Life-Saving Checklist for Rough and Fine Works

Doğan Tomris
February 8, 2026
12 min read
From Construction to Opening: The 52-Item Life-Saving Checklist for Rough and Fine Works

Category: 🏗️ Venue Opening & Construction | Reading time: 10-12 min


You signed the lease. Key in hand. Now what? The foreman came and said, "let's start." But what, in what order, how long? If you start without knowing this — a 3-month job will stretch to 6 months, a 50,000₼ budget will become 90,000₼.

The construction process is the most expensive, most stressful, most problem-causing stage of opening a restaurant. But with systematic planning, you can save time, money, and nerves.

In this article, I divide construction into 5 phases. I give the checklist for each phase. Print it, give it to the foreman, check it every day.



PHASE 1: PREPARATION (Before Construction — 2-4 weeks)

In this phase, do not pick up a brick. First, complete the documents, permits, and technical inspections.

#ItemNote
13-phase electrical inspectionASAN Kommunal → Azerishig technical inspection
2Natural gas connection inspectionIs there a gas line? If new installation is needed — add to budget
3Water and sewerage entry pointsWhere? Does it match the kitchen plan?
4Chimney exhaust pointWhere will it be? Risk of neighbor conflict?
5Ceiling height measurementMinimum 3 meters — for suspended ceiling + ventilation
6Object code checkPrevious tenant's tax/DSMF debt?
7Construction project (plan) preparationKitchen, hall, storage, toilet — location of everything
8Construction budget preparationRough + finish work + reserve fund (15%)
9Foreman/contractor selectionCompare from at least 3 proposals
10Construction contractTime, price, material, penalty terms in writing
11AQTA registrationASAN Service/KOBİA — FREE
12FHN permit applicationFire safety plan
⚠️

⚠️ Warning: 3-phase electricity, natural gas and chimney — do NOT start construction without checking these three. These three alone can kill the project. We have explained in detail in our "12 Mistakes" article.


PHASE 2: ROUGH WORK (3-6 weeks)

Rough work — the "skeleton" of the building. Walls, floors, ceilings, water/electricity/gas lines.

#ItemNote
13Demolition workOld walls, floors, suspended ceilings
14New wall constructionKitchen-dining area separation, toilet, storage
15Water installation (laying)Kitchen sinks, toilet, dishwasher location
16Sewage system layingGrease trap mandatory
17Electrical wiring installation3 phases + separate lines: kitchen, dining area, lighting
18Gas line installationNatural gas — do not use propane!
19Ventilation ductsKitchen — separate, dining area — separate system
20Chimney installationChimney filters, fire extinguisher system
21Floor preparationNon-slip, washable in kitchen
22Ceiling preparationStructure for suspended ceiling
23Fire extinguishing systemSprinkler or extinguisher — Ministry of Emergency Situations requirement
24InsulationSound insulation (for neighbor complaints) + heating

PHASE 3: FINISHING WORK (3-5 weeks)

Finishing work is the part the customer will handle. Wall paint, flooring, lighting, furniture.

#ItemNote
25Wall paint / coveringColors matching the concept
26FlooringHall: parquet/ceramic, Kitchen: non-slip ceramic
27Suspended ceiling installationLight points must be planned in advance
28Lighting systemDimmer is mandatory — day/evening difference
29Air conditioning systemKitchen + hall + storage — separate zones
30Toilet renovationCustomer toilet + staff toilet must be separate
31Bar/cash register areaPOS location, money storage, power outlets
32Showcase / entrance designFirst impression — detailed in our "Atmosfer" article
33Signage installationDo not forget ADRA permission!
34Furniture installationTables, chairs — matching the concept
35Decorative elementsPaintings, plants, accessories
36Music systemSound system + business music subscription

PHASE 4: EQUIPMENT AND TECHNOLOGY (1-2 weeks)

#ItemNote
37Industrial stove/hob installation3-phase connection, gas connection
38Refrigerators installationTemperature check, 24-hour test
39Freezer installation-18°C test
40DishwasherWater connection + drainage
41Preparation tables (stainless steel)Stainless steel — hygiene requirement
42POS system installationCash register + tablets + printer
43Internet / Wi-FiStable internet is essential for POS
44Camera systemKitchen, cash register, entrance — minimum 4 cameras
45Alarm systemPost-closing security
⚠️

⚠️ Warning: Leasing equipment may be more budget-friendly. Instead of buying 50,000₼ worth of equipment outright, you can make monthly payments via leasing — less burden on the initial budget.


PHASE 5: OPENING PREPARATION (1-2 weeks)

Construction is complete. Now prepare for opening.

#ItemNote
46AQTA final inspectionAre hygiene requirements fully met?
47FHN final inspectionFire equipment, exits
48Hiring employeesRecruitment + medical certificates
49Training period (min 1-2 weeks)Menu, service, POS, hygiene
50Soft openingFriends, family — 3-5 day test
51Menu final checkPrices, food cost, design
52Grand opening (official opening)Marketing, social media, invitees

Budget planning — real numbers

Approximate construction budget for a small to medium restaurant (50-80 m², 30-40 seats):

PhaseEstimated cost (₼)Percentage
Preliminary phase (documents, project)2,000-5,0003-5%
Rough work20,000-40,00030-35%
Fine work15,000-30,00020-25%
Equipment25,000-50,00030-35%
Opening preparation (training, soft opening)3,000-5,0003-5%
Reserve fund (15%)10,000-20,00015%
TOTAL75,000-150,000₼100%
⚠️

⚠️ Warning: These numbers are very variable — the condition of the building, location, concept, material selection changes everything. But a reserve fund is mandatory — minimum 15%. As we said in our "Hidden Costs" article: unexpected costs ALWAYS occur.


Most Common Construction Mistakes

MistakeResultSolution
Starting without checking the 3 phases15,000–20,000₼ additional costCheck BEFORE construction
Hiring a “cheap master”Half-finished work, rework neededCompare 3 bids, don’t pick the cheapest
Not having a written contractDelays, price increases, unable to claimAgree on everything in writing
Drawing the kitchen plan without a chefEquipment doesn’t fit, workflow disruptedInclude the head chef in planning
Not setting aside a reserve fundUnexpected costs collapse the budgetMinimum 15% reserve
Installing a sign without ADRA permitFineGet permission first
Building a chimney without talking to neighborsComplaints, municipal issuesInform in advance

📋DK AGENCY NOTU

📝 DOĞAN NOTE: “One entrepreneur came, said ‘renovation will be done in 2 months.’ It took 5 months. Why? Because there was no plan. The foreman brings paint today, installs water pipes tomorrow, and goes back to painting the next day. The phases got mixed up, every job was done twice. If he had given this checklist to the foreman — it would have been done in 2.5 months. Phased work = time savings = money savings.”

DT
— Doğan Tomris

💡

💡 DK Agency: Do you want construction supervision and project management? The DK Agency team plans the construction process from scratch — budget, time, phase control, equipment selection, AQTA/FHN preparation. Includes opening strategy and soft opening planning.

📧 info@dkagency.com.tr | 🔧 dkagency.com.tr/aletler | 🌐 dkagency.com.tr/aletler/marketinq-ocagi

🎓

DANNY MEYER

Restaurants don't close because of bad food. They close because of bad planning.

DM
DANNY MEYER

📖 Source: Setting the Table

🎓

ANTHONY BOURDAIN

The desire to open a restaurant is a strange and terrible disease. The probability of the investment returning is one in five.

AB
ANTHONY BOURDAIN

📖 Source: Kitchen Confidential

📋

DK AGENCY NOTE

The biggest mistake in the rough work phase: hiring a 'cheap handyman'. The cheap handyman's water pipe leaks in 6 months, the electrical line causes problems in 1 year. Don't cut quality in rough work — save on fine work, not on rough work.