From Construction to Opening Checklist
52-item practical plan: from electrical to fire safety, from soft opening to grand opening — put every step in order.
From Construction to Opening Checklist
Do not start the project without Azərişıq technical inspection.
If a new line is needed, include it in the budget upfront.
Confirm compatibility with the kitchen plan.
Assess complaint and municipality risk in advance.
Minimum 3 meters is comfortable for suspended ceiling and ventilation.
Ensure no tax or DSMF debt causes problems later.
Kitchen, hall, storage and toilet planned according to flow.
Do not start without setting aside a buffer for hidden costs.
Collect a minimum of 3 quotes.
Time, price, materials and delay clauses must be in the document.
Food safety side should proceed in parallel.
Do not leave fire safety plan to the last day.
Budget planning
Estimated breakdown for a 50-80 m², 30-40 seat restaurant.
Location, property condition and concept change this range.
OCAQ Panel