Contents · 8 sections
Thursday, a 60-seat cafe in Nasimi district. At 10:30, two tables in the hall are occupied, but there are three waiters, two cooks, a barista and a dishwasher on shift: seven people. The waiters are busy with their phones. At 19:30, the hall is full, guests are waiting at the door, an order sits in the kitchen for 25 minutes, and the same three waiters are running around. At the end of the month, the owner looks at the report: "Staff costs are too high, let's cut people." He cuts, evening service gets even worse, and the best waiter quits.
The problem is not the number of people. The problem is that the schedule is built on habit, not sales: the same two shifts every day, the same number of people on each shift. In this article, I give a system for a small restaurant: starting from hourly POS sales, to the labour hours needed per station, from there to the schedule and the weekly review. Then I show how a free AI chat (ChatGPT, Claude) speeds up this work and where it can mislead you.
Staff retention and team motivation are a separate topic (see the "7 retention systems" post on the blog). Here it is only the math of hours and manat.
The logic of the system: five steps
- Hourly sales (past): hour-by-hour sales and check/guest counts for the last 4 same weekdays from the POS system.
- Guest forecast (future): the average of those figures + an adjustment for this week (holiday, weather, promotion, reservations).
- Labour hours needed per station: how many hands are needed in each hour interval for the hall, kitchen, bar/register and dishwashing.
- Schedule: converting the needed hours into legally compliant shifts.
- Target and review: labour cost percentage and sales per labour hour (SPLH); once a week the forecast is compared with actuals.
Two key indicators:
| Indicator | Formula | What it tells you |
|---|---|---|
| Labour cost % | staff cost ÷ sales × 100 | what percentage of sales goes to staff |
| SPLH (sales per labour hour) | sales ÷ total hours worked | how many manat of sales one labour hour brings in |
Labour cost percentage is an end-of-month indicator. SPLH works hour by hour: it shows in which hour you have too many people and in which too few. Track both together, because the percentage rises on its own when sales fall, while SPLH ties the problem to a specific hour.
Sample calculation: a 60-seat Baku cafe, on a Friday
Note: all figures below are an illustrative example. Not a real restaurant. Take your own figures from the cash register report.
The cafe is open 09:00–23:00. The owner splits the cash register report of the last four Fridays into hourly blocks and takes the average.
Step 1–2. Sales and guest forecast
| Block | Time | Guests | Average check | Sales | Guests per hour |
|---|---|---|---|---|---|
| Morning | 09–12 | 24 | 9 ₼ | 216 ₼ | 8 |
| Lunch | 12–15 | 75 | 14 ₼ | 1,050 ₼ | 25 |
| Afternoon | 15–18 | 30 | 8 ₼ | 240 ₼ | 10 |
| Evening | 18–21 | 80 | 20 ₼ | 1,600 ₼ | 26.7 |
| Closing | 21–23 | 20 | 12 ₼ | 240 ₼ | 10 |
| Total | 229 | 14.6 ₼ | 3,346 ₼ |
79% of sales (2,650 ₼) fall in two peaks, in just 6 hours. In the remaining 8 hours, sales are 696 ₼. The whole secret of the schedule lies in this curve.
Step 3. Required labor hours by station
The owner sets work standards for their own restaurant (these are also examples; yours may differ based on your menu, kitchen and floor plan):
- Floor: one waiter comfortably serves about 14 guests per hour at peak, at least 1 person during quiet hours.
- Kitchen: one cook handles the orders of about 15 guests per hour, at least 1 person. 1 hour of prep before opening.
- Bar/cashier: 1 person all day.
- Dishwashing: only at peaks (12–15 and 18–22).
We divide the guest count by the standard and round up:
| Block | Floor | Kitchen | Bar | Dishwashing | Total people per hour |
|---|---|---|---|---|---|
| 08–09 prep | – | 1 | – | – | 1 |
| 09–12 | 1 | 1 | 1 | – | 3 |
| 12–15 | 2 | 2 | 1 | 1 | 6 |
| 15–18 | 1 | 1 | 1 | – | 3 |
| 18–21 | 2 | 2 | 1 | 1 | 6 |
| 21–23 | 1 | 1 | 1 | 1 (until 22) | 3–4 |
| 23–24 closing | 1 | – | – | – | 1 |
Total required labor hours: floor 21 + kitchen 21 + bar 14 + dishwashing 7 = 63 hours.
Step 4. Schedule: turning required hours into shifts
When turning hours into shifts, the law and the human factor come into play: a shift should not be longer than 8 hours, and small "fragment" shifts tire the worker. Sample schedule:
| Station | Shift | Work hours |
|---|---|---|
| Floor 1 | 09:00–17:00 | 8 |
| Floor 2 (part-time) | 12:00–16:00 | 4 |
| Floor 3 | 16:00–24:00 | 8 |
| Floor 4 (part-time) | 18:00–22:00 | 4 |
| Kitchen 1 | 08:00–16:00 | 8 |
| Kitchen 2 | 15:00–23:00 | 8 |
| Kitchen 3 | 13:00–21:00 | 8 |
| Bar 1 | 09:00–17:00 | 8 |
| Bar 2 | 16:00–24:00 | 8 |
| Dishwasher | 13:00–21:00 | 8 |
| Total | 72 hours |
Breaks are not included in these hours; they are written separately in the schedule (see the legal section below). 72 hours is 9 hours more than the required 63: this is the "price" of shift length and handover overlaps. A decision also emerges here: since finding a part-time cook is difficult, the third cook is scheduled for a full shift of 13:00–21:00. In this case, between 12:00 and 13:00 only one cook remains in the kitchen, so the morning prep (mise en place) must be complete. If the cash register shows the lunch rush starts at 12:00, revisit this decision.
Step 5. Calculation: old schedule and new schedule
In the example, the employer's full cost per labor hour (wages + employer-paid taxes and social contributions) is taken as 7 ₼. It is assumed that the contract adds +2 ₼ per hour for night hours (after 22:00). Both are examples: get your own figure from your accountant.
Old schedule: 6 people on the 09–16 shift, 7 people on the 16–23 shift, each shift 7 hours.
| Old schedule | New schedule | |
|---|---|---|
| Hours worked | 6×7 + 7×7 = 91 | 72 |
| Night hours (after 22:00) | 7 | 5 |
| Labor cost | 91×7 + 7×2 = 651 ₼ | 72×7 + 5×2 = 514 ₼ |
| Labor cost % (sales 3,346 ₼) | 19.5% | 15.4% |
| SPLH | 3,346 ÷ 91 = 36.8 ₼ | 3,346 ÷ 72 = 46.5 ₼ |
The difference is 137 ₼ per day. If the same work is done for every day of the week and the daily difference stays at this average, it comes to about 4,000 ₼ per month. Note: staffing at the evening peak has not decreased; the floor and kitchen remain at 2+2. The savings come entirely from the quiet hours. We reduce labor cost not by cutting hours, but by moving hours in line with sales.
A note here: this calculation covers shift workers only. The fixed salary of the manager and the chef is added separately, and the total labor cost percentage will come out higher. Set your target percentage not from figures "heard" in the market, but from your own profit-and-loss statement: how much is left for labor after product cost, rent and other expenses — that is the target.
What does SPLH by block say?
| Block | Sales per hour | People per hour | SPLH |
|---|---|---|---|
| Morning 09–12 | 72 ₼ | 3 | 24 ₼ |
| Lunch 12–15 | 350 ₼ | 6 | 58 ₼ |
| Afternoon 15–18 | 80 ₼ | 3 | 27 ₼ |
| Evening 18–21 | 533 ₼ | 6 | 89 ₼ |
| Closing 21–23 | 120 ₼ | 3–4 | 30–40 ₼ |
During quiet hours, staffing is already at the minimum, yet SPLH is still low. This is the "fixed cost of being open." Two questions arise here: can the morning barista also serve tables (with cross-training, the floor drops by 1 person)? Is opening at 09:00 really necessary, or is 10:00 enough? These questions cannot be answered without SPLH.
Labour Code: the limits you need to know when building a schedule
The article numbers below have been verified against the official text of the Labour Code of the Republic of Azerbaijan (1 February 1999, 618-IQ) published on the state website. The law changes: before approving a schedule, check the current version on e-qanun.az or show it to a lawyer. This section is not legal advice.
| Topic | Code | Effect on the schedule |
|---|---|---|
| Daily and weekly norm | Article 89: normal daily working time may not exceed 8 hours, weekly — 40 hours | Full-time employee: 5 days × 8 hours. The shifts in the example are 8 hours |
| Six-day week | Article 90: in a 40-hour six-day week, daily work may not exceed 7 hours | For someone working 6 days, the shift is 7 hours, not 8 |
| Summarized accounting | Article 96: may be applied provided that total hours in the accounting period do not exceed the norm; a shift may not be longer than 12 hours | 12-hour shifts are possible only when this regime is formalized |
| Night time | Article 97: the time from 22:00 to 06:00 is considered night time | The part of the closing shift after 22:00 is night work |
| Payment for night work | Article 166: night work is paid at a higher amount, not below the limit set by the Cabinet of Ministers; the specific amount is written in the contract | Count night hours separately in the schedule |
| Overtime work | Article 99: by the employer's order and with the employee's consent; Article 100: may not exceed 4 hours on two consecutive working days | "Stay an extra hour" cannot become a habit |
| Payment for overtime | Article 165: for time-rate employees, at least double the hourly wage (a separate rule for piece-rate employees); it cannot be replaced by an additional rest day | Overtime is the most expensive hour in the schedule |
| Breaks and daily rest | Article 103: rest and lunch breaks are provided and are not included in working time; rest between two working days is at least 12 hours | An employee finishing at 24:00 cannot start earlier than 12:00 the next day |
| Weekly rest | Article 104: 2 rest days in a five-day week, 1 rest day in a six-day week | Every employee's rest days must be visible in the schedule |
| Work on holidays and rest days | Article 107: public catering establishments are among the exceptions; Article 164: for hourly/daily-rate employees, work on these days is paid at least double (for monthly-salaried employees, an additional one-day amount within the norm); at the employee's wish, another rest day may be given instead of money | The budget for a holiday week is calculated separately |
| Recording of working time | Article 102: the employer must keep an accurate record of each employee's actual working time and overtime hours | This record is also the source for the SPLH calculation |
In addition, there are extra restrictions on involving certain groups of employees (for example, employees under 18, pregnant women) in night work and overtime work. If you have such an employee, check the current text separately.
The most common mistake in an example schedule is the "close-open" shift: Bar 2 closes at 24:00, and the owner puts the same person on the 09:00 opening the next day. This violates the 12-hour rest in Article 103, and a tired employee makes mistakes at the cash register.
How artificial intelligence accelerates this work
In the global market, this work is becoming automated. In its fall 2026 release, the US restaurant POS system Toast introduced a new toolset called "Toast IQ Team," including a Scheduling Agent (beta). According to the company's description, the agent builds a schedule in seconds based on employees' availability, expected sales and overtime risk; the set also includes a sales forecast based on POS history. Toast claims that overtime hours are already significantly low among its users, but this is the company's own comparison, not independent research.
What matters for you is the logic: the agent also performs the five steps above. A small cafe can do the same work in draft form in a free AI chat (ChatGPT, Claude, etc.). There is one condition: you give it the schedule with ready numbers.
Ready-made prompt (copy and fill in with your own numbers):
You are a restaurant operations assistant. Using the information below,
prepare a DRAFT of next week's shift schedule.
1) Expected guest count by day and hour (table):
[copy from POS: day | time range | guests | sales ₼]
2) Work standards:
- Waiter: 14 guests per hour, minimum 1
- Cook: 15 guests per hour, minimum 1, prep 1 hour before opening
- Bar/cashier: 1 while open
- Dishwasher: only 12–15 and 18–22
3) Employees (use codes instead of names):
[code | station | full/part-time | contracted weekly hours | days and hours unavailable]
4) Rules (MANDATORY):
- Shift no longer than 8 hours, full-time no more than 40 hours per week
- At least 12 hours rest between two shifts
- 2 days off per week for each employee, consecutive
- Do not schedule overtime
- Distribute weekend and closing shifts equally among employees
- Show breaks separately
5) Hourly cost: 7 ₼, +2 ₼ after 22:00.
Provide the result in this form:
a) Day × employee table (shift hours)
b) For each day: total work hours, employee cost, labor cost %, SPLH
c) Comparison of planned headcount vs. required headcount in each time range
d) List of places that violate or are borderline on the rules
Show your calculations step by step so I can check them.
The strength of this prompt: you don't "ask" the AI for the law, you give it the rule yourself. Your role is to check and correct the draft. Half a day's work drops to 30–40 minutes.
Limits, keep in mind:
- The AI doesn't know your employees. It doesn't know who gets stressed at peak times, who is new, or that two employees don't get along on the same shift. You add this information.
- It can make calculation errors. Check the total hours and percentages with a calculator before posting the schedule.
- It can write as if it "knows the law." Don't ask it for article numbers or amounts; verify the legal limits yourself from the table above and the current text.
- Don't paste personal data. Use codes instead of names, no ID numbers, phone numbers, or salary history.
- The final decision and signature belong to the manager. Announce the schedule to employees on time, at least a week in advance.
If you want to do the calculation without AI, the Staff planner in DK Agency's free tools section (/az/toolkit) does the hours and cost calculation for you; it's also convenient to prepare the table you'll paste into the AI there.
Weekly check: the 30-minute Monday loop
The schedule is not a document you set up once and forget. Every Monday:
- Put last week's forecast and actual sales side by side, block by block.
- Take the actual hours worked from the time records (not the planned ones).
- Calculate labor cost % and SPLH for each day; note the 3 lowest and 3 highest blocks.
- If a block with low SPLH repeats for two weeks in a row: shorten the shift, merge stations (cross-training), or rethink the operating hours.
- If a block with high SPLH has waiting complaints or delayed orders: add people there. Very high SPLH is not always a success — sometimes it means guests are waiting.
- Adjust next week's forecast: holidays, weather, reservations, promotions.
- Count overtime separately: every hour is paid at double rate (Article 165), and if it repeats, there is a gap in the schedule.
Misconceptions
| Common belief | In reality |
|---|---|
| "To reduce labor cost, you need to cut people." | Often the problem is not the number of people but where the hours are placed. In the example, cost dropped 21 % without reducing staff at peak. |
| "The same number of people on every shift is fair." | Fairness is the equal distribution of unpopular shifts, not the same headcount regardless of sales. |
| "If labor cost % is low, everything is fine." | The percentage is low, but if guests are waiting, you are losing sales. Read the percentage together with SPLH and service speed. |
| "The restaurant operates on holidays, so a holiday is an ordinary day." | Food service can operate on holidays, but work on holidays and rest days is paid extra: at least double the hourly/daily rate (Article 164). |
| "Artificial intelligence made the schedule, so it is legally compliant." | Artificial intelligence tries to follow the rules you give it, but it can make mistakes. Legal verification is your responsibility. |
| "Staying an hour late is not a problem." | Overtime work is done with the employee's consent, cannot exceed 4 hours on two consecutive days, and is paid at double rate (Articles 99, 100, 165). |
Print checklist
- I exported the hourly sales and guest counts for the last 4 same weekdays from the POS
- I divided the day into 4–6 blocks and wrote a guest forecast for each block
- I wrote my own work standard (guests per hour) and minimum headcount for each station
- I calculated the required labor hours block by block
- I built shifts without exceeding 8 hours (7 in a six-day week)
- No employee's weekly hours exceed 40
- There are at least 12 hours of rest between two shifts for everyone (no "clopen")
- Each employee's rest days are shown in the schedule
- Breaks are written separately in the schedule
- Hours after 22:00 are counted separately as night work
- Double pay for holidays is added to the budget
- Planned labor cost % and SPLH are calculated and compared with the target
- The schedule was posted where everyone can see it at least one week in advance
- The 30-minute Monday check is on the calendar
- If I used artificial intelligence: I checked the calculations by hand and did not paste personal data
Sources
- Labor Code of the Republic of Azerbaijan (1 February 1999, 618-IQ), official text: articles 89, 90, 96, 97, 99, 100, 102, 103, 104, 107, 164, 165, 166. Text published on the website of the State Committee for Family, Women and Children Affairs: https://www.family.gov.az/store/media/%C6%8Fm%C9%99k%20M%C9%99c.doc
- Current version of the Labor Code (for verification): https://e-qanun.az/framework/46943
- AZERTAC, information from the Ministry of Labor and Social Protection of the Population on working time norms (17.12.2021): https://azertag.az/xeber/1954718
- Toast, Fall Release 2026: https://pos.toasttab.com/news/toast-fall-release-2026
- Nation's Restaurant News, "Toast unveils an array of new AI agents for restaurants" (07.10.2026): https://www.nrn.com/restaurant-technology/toast-unveils-an-array-of-new-ai-agents-for-restaurants
How DK Agency helps
If what this post describes is happening in your restaurant, café or hotel, write to us: we will look at it together and show you the first step. The first diagnostic is free.
Ask KAZAN AI about this topic
Your dish, your numbers. KAZAN AI answers from the DK knowledge base and points you to the right tool.
Open KAZAN AI


